Planning a large blasting job away from the workshop

For a large façade or installed structure, the machine travels to the work.

SodaBlast Systems · SBS SYSTEM

In short

For a large façade or installed structure, the machine travels to the work. The SB-500 Trailer carries its own compressor and air treatment. Before quoting, walk the hose route and identify where fuel, media and completed sections will be accessible.

What the Croatian stone project illustrates

In a Croatian job reported by SBS, Ante cleaned 300 m² of stone walls in two days. Treat it as one project record. For your own quote, time a representative bay, include moves and cleanup, and agree which sections the customer can accept each day.

Divide the site into sections the client can hand over independently. Record distances between sections and time spent moving hoses and materials. On a multi-day visit, agree a storage point and the next morning’s starting area before leaving the site.

Sources and basis

Publisher

Published by SodaBlast Systems Europe, the knowledge hub of the SodaBlast Systems brand, operated by SBS SYSTEM, Łódź, Poland.

SB-500 Trailer specifications and equipment

SodaBlast Systems websites

Essential — always active

Saving your choice and protecting the contact form. Not used for advertising or visit analysis.

Services start only after activation by the operator and your relevant consent. Listing a service does not mean it is already active.